Interior Investigations:
ACT 3: Design and build a second level under the first, connecting the two floors with a central custom stair. New lower level to have 3 bedrooms, 3 baths at the North and South. In the center a loft ‘garage’ and laundry, a family relaxing and viewing area. New windows at new exterior openings. Borrowed light used often through textured and opal glass panels. Custom metal work included at stair and walls and dividers as well as custom sink bases and steel panels at the AV wall. Custom concrete sinks at the three bathrooms
Bathrooms on Lower Level